MECHANICAL ENGINEERING - OUR WORKSHOPS
Al Hajiry Mechanical division operates a head office in Wadi Kabir, Muscat.
We have 3 manufacturing & fabrication workshops at Wadi Kabir, Nizwa and Sohar. Each of these workshops have the latest machinery and equipment including:
- Automatic blasting and airless gun painting
- 20mm rolling machine
- 2x10 tons overhead cranes
- Shearing machine up to 12mm
- Hydraulic press brake of 300 tons
- Plasma cutting machines
- TIG, MIG, SAW & SMAW facilities
- Mobile cranes of 25, 30, 50 & 100 tons
1) Wadi Kabir Workshop
- Situated on the outskirts of the Wadi Kabir region, closer to the mountains.
- Approx. 10,000 M2 used for fabrication works.
- W/Shop has the equipments and machines for carrying out jobs of varying capacity.
- Approx. 3000 tons of work per annum
- 20 management/executive staff & 150 skilled workers.
- Medium to heavy fabrication jobs such as tanks, silos, hoppers, mobile camps and various other structural works for drilling contractors.
2) Sohar Workshop
- Facility located in the 4th phase of the Sohar Industrial Estate.
- We have approx. 20,000 M2 of built –up area (2800 M2 covered shed) which is used for fabrication works.
- W/shop has new equipments and machines for carrying out jobs of varying capacity.
- Grit Blasting – Steel Grit (completely enclosed with exhaust recycling system) and Coating bay (enclosed to get proper coat and finish – combined area 635 M2
- Facility for assembling and testing finished products
- ASME “U” certification for manufacture of pressure vessels conforming to ASME Sec. VIII Div. I construction
- ASME “S” certification for manufacture & assembly of power boilers
- National Board Certificate - “R” for Shop Repairs / Alterations & Field Repairs of Pressure Vessels & Boiler
3) Al Hajiry Oil & Gas Co llc ( Nizwa Workshop)
- Facility located in the 1st phase of the Nizwa Industrial Estate.
- We have approx. 40,000 M2 of built –up area (3000 M2 covered shed) which is used for fabrication works.
- W/shop has new equipments and machines for carrying out jobs of varying capacity.
- Grit Blasting – Steel Grit (completely enclosed with exhaust recycling system) and Coating bay (enclosed to get proper coat and finish – combined area 700 M2
- Facility for assembling and testing finished products
- Currently the facility is being prepared for API Monogram 4F certification.